Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

SCIENCE-ENGINEERING CHEMICAL ENGINEERING JOB INFO LVL 2 LESSONS 9,10,11 QUESTIONS AND AN, Exams of Engineering

SCIENCE-ENGINEERING-CHEMICAL ENGINEERING JOB INFO LVL 2 LESSONS 9,10,11 QUESTIONS AND ANSWERS 2025/2026 What National Electrical Code (NEC) chapter covers the requirements for firestopping? Select one: a. 1 b. 2 c. 3 d. 5 - ANS-✔✔3 A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? penetration. Select one: a. joint b. membrane c. passive d. through - ANS-✔✔through When penetrating a concrete fire-resistive wall or floor assembly with RMC, it is not acceptable to use mortar to fill the annular space. Select one: True False - ANS-✔✔false When a conduit passes through only one side of a fire-resistive wall assembly, it is considered as a ? penetration. Select one: a. joint

Typology: Exams

2024/2025

Available from 07/14/2025

passlist-passlist
passlist-passlist 🇺🇸

5

(3)

2.1K documents

1 / 17

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
SCIENCE-ENGINEERING-
CHEMICAL ENGINEERING JOB
INFO LVL 2 LESSONS 9,10,11
QUESTIONS AND ANSWERS
2025/2026
S c i e n c e
E n g i n e e r i n g
C h e m i c a l E n g i n e e r i n g
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff

Partial preview of the text

Download SCIENCE-ENGINEERING CHEMICAL ENGINEERING JOB INFO LVL 2 LESSONS 9,10,11 QUESTIONS AND AN and more Exams Engineering in PDF only on Docsity!

SCIENCE-ENGINEERING-

CHEMICAL ENGINEERING JOB

INFO LVL 2 LESSONS 9,10,

QUESTIONS AND ANSWERS

S c i e n c e

E n g i n e e r i n g

C h e m i c a l E n g i n e e r i n g