


Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Material Type: Project; Class: Software Engineering I; Subject: Software Engineering; University: Southern Polytechnic State University; Term: Spring 2009;
Typology: Study Guides, Projects, Research
1 / 4
This page cannot be seen from the preview
Don't miss anything!
Turn in the review results by 02/23/2009 changed to 3/16/ (10 points)
2. Design the system from the requirements specified by the team which your team conducted the review. Due date for item 2 is 4/1/2009. changed to 4/6/2009 ( points) 3. Generate the test cases for the design (4/8/2009 changed to 4/13/2009 – 10 points). 4. Perform internal reviews of the design and test cases Perform this at your teams’ convenience (between 4/8/ through 4/15/2009) and keep records of the review by types of problems found and severity of problems found. (Include the review results in your final presentation with prototype) 5. a) Develop the prototype of the design and run test cases for the prototype. (this prototype will be demonstrated in class with your major test cases) b) Write up & present the experience (power point), discussing several of the project and quality related topics. a. what was the most difficult item in this project b. how would you describe the process your team used c. what was the team dynamics d. test problems found by type and severity e. how good is the quality of the work before and after the review (based on error found and rework time spent.
Team A : Reviews Team C’s Req. Document and design/implement it. Team B : Reviews Team A’s Req. Document and design/implement it. Team C : Reviews Team B’s Req. document and design/implement it.