Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Elevator Installation and Maintenance Exam Questions and Answers, Exams of Engineering

A series of questions and answers related to elevator installation and maintenance, focusing on safety procedures, equipment handling, and technical knowledge required for elevator mechanics. It covers topics such as tool selection, rigging, hoisting, rail installation, and machine maintenance. The questions are designed to test understanding of industry standards and best practices, making it a useful resource for those preparing for certification or seeking to enhance their knowledge in the field. Practical insights into the daily tasks and challenges faced by elevator technicians, offering valuable learning material for both novice and experienced professionals. It emphasizes the importance of safety and precision in elevator work, highlighting the critical role of mechanics in ensuring the safe and reliable operation of elevators. Useful for university students, high school students and lifelong learners.

Typology: Exams

2024/2025

Available from 05/20/2025

paul-marks
paul-marks 🇺🇸

3.7

(32)

1.4K documents

1 / 19

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NEIEP 200 Final Exam| Questions and
Answers| Guaranteed Success| 2025
you are about to loosen a fishplate bolt. which wrench would be least likely to slip?
a. 6 point box end wrench
b. 12 point box end wrench
c. open end wrench
you are using a plumb line to check a rail for plumb. you find that at the top it
measures 1" and at the bottom it measures 1 1/4". what does this tell you?
a. the top of the rail needs to go towards the center
b. the top of the rail needs to go toward the wall
c. the bottom of the rail needs to go toward the wall
you are plumbing rails on a high rise installation. what type of plumb line should
you use?
a. nylon string
b. monofilament wire
c. piano wire
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13

Partial preview of the text

Download Elevator Installation and Maintenance Exam Questions and Answers and more Exams Engineering in PDF only on Docsity!

NEIEP 200 Final Exam| Questions and

Answers| Guaranteed Success| 2025

you are about to loosen a fishplate bolt. which wrench would be least likely to slip? a. 6 point box end wrench b. 12 point box end wrench c. open end wrench you are using a plumb line to check a rail for plumb. you find that at the top it measures 1" and at the bottom it measures 1 1/4". what does this tell you? a. the top of the rail needs to go towards the center b. the top of the rail needs to go toward the wall c. the bottom of the rail needs to go toward the wall you are plumbing rails on a high rise installation. what type of plumb line should you use? a. nylon string b. monofilament wire c. piano wire

you need to cut into a concrete wall. which tool should you use? disc grinder with a diamond blade disc you need to select a heavy duty drill for drilling 5/8" holes in a machine beam. what factor determines the drill rating? chuck size you are tasked with setting 3/4" concrete anchors. which type of drill should you use? rotary hammer you need to cut and 8ft section of 1/2" EMT conduit pipe. what would be the best tool for the job? hacksaw with 24 teeth per inch you are directed to move oxy-acetylene cylinders from a storage area to a work site. what is the proper way to transport them? in an upright position you are setting up welding equipment. what is the maximum psi that the regulator for the acetylene gas may be adjusted to?

you are rigging elevator equipment with a sling angle of 60 degrees. you are using a shouldered eye bolt with a tapped 1/2" diameter hole. once the shoulder is seated, what is the minimum thread depth required? at least 3/4" you will be hoisting 1klbs with a single leg vertical hitch. what will the sling load be when the load is in the air 1k lbs you must attach a wire rope to a load by creating a loop with 3 u-bolt wire rope clips. how should the clips be attached? no nuts on a dead horse you are using a bowline knot- what is one disadvantage of this knot is can easily loosen when not loaded you are preparing to lift a load and need to tie the ends of two ropes together. which knot should you use? square the rated load tag on a sling is 2000lbs. what does this mean?

load limit that can be picked and held you need to lift rails to the top floor of a building. with a well wheel at the top of the hoistway, what type of rope should you use? synthetic a crane is needed to hoist controllers on to the roof. who is responsible for making the lift plan? lift director during elevator install you need to rig equipment to the top of the building. what info must be included in the lift plan? capacity of rigging material the crane operator is awaiting you signals to lift a pallet of parts. what are the correct audible signals to raise the load 20 feet? hoist, hoist up, 20,15,10,1, hoist stop you are storing fiber core wire rope slings. what could cause damage to the core material? solvents

anyone which safety feature protects against getting caught under a counterweight? counterweight guard you are installing a 250 fpm freight elevator. what type of buffers should you use? oil buffers you are working in a pit deeper than normal. what can you do to bring the buffers up to the proper height? buffer stands what document will tell you if you need buffer channels? final layout when installing a reduced stroke buffer, what additional component is required? speed limiting device you just attached a governor tension sheave to a rail. what must be done to finalize its position? check for plumb and tighten all bolts.

you are installing pit equip for a high rise elevator. which of the following is required for an 800 fpm car? compensating sheave tie down you have installed the comp rope sheave. what must you do to prepare for comp rope install? block the comp sheave above normal position you are about to perform maintenance on pit equip. what is required for oil buffers? check the oil level you are working in a pit 72" deep. what does asme require regarding stop switches? a second stop switch must be installed 47" above the pit floor what would you use to connect round rails? bushings you are moving rails to storage. what should be taken into consideration? floor load capacity you must stack rails on the floor of a storage room. how do they go?

you are building a hoistway guard rail. how much lateral force must the top rail be capable of taking 200lb before beginning work each day, which of the following safety precautions must be performed test safeties what is the name of the guide rail from which all measurements are taken king rail bbg stands for... back to back guide distance after surveying the hoistway, you are directed to pull the lines. what will be affected? the positions of the rails you are installing the first set of rail brackets. to provide most stability, what level are the brackets typically located? even with the top and bottom care guides

you have installed the rails but need to adjust DBG. which rail would you adjust queen what should be installed to compensate for building compression jack bolts what must be done to the rails to ensure a quiet and smooth ride file the rail joints the hoistway is out of plumb. what may correct the issue pull the lines you are working on an elevator machine and you notice the drive sheave and brake drum are directly mounted on the motor shaft. what machine are you working on? gearless you must replace a single threaded worm shaft on a geared traction machine, you notice that the new worm shaft is double threaded. given the same hoist motor rpm, how will this affect the machine performance ring gear will turn faster

the drive sheave on a geared traction machine you have installed uses non metallic groove inserts. what advantage do these inserts provide over standard metal v groove and u groove drive sheave types? coefficient of friction is more constant after installing machine beams you must attach beams to carry the 2:1 dead end hitch plates. which of the following beam types is best suited for this application channel beams you will be installing I beams on hoistway block walls. what should the beams be set on during the leveling process bearing plate and grout you are installing equip in a second space. which safety device is required stop switch you are installing a deflector sheave. when should rigging equip be removed? only after the sheave is in place and secured you are piping a governor in a secondary space. how would the governors location affect the install

overhead clearances change in secondary spaces where should the machine room light switch be located on the lock jamb side of the door you arrive at a job and notice the counterweight has a governor. what does this mean there's an occupied space below you are performing a final acceptance test on a 700fpm elevator. at what percent of the mechanical trip speed should the electrical overspeed switch trip not more than 95% why is it necessary that a governor be mounted a a steel channel section (high rise) to support the extra weight of the governor rope you are performing routine maintenance on a governor, just have to paint it. what test should you do to make sure all parts move freely hand test you have installed hoistway slowdown switches on brackets attached to the main guide rails. what other component actuates these

immediately you are performing an acceptance test with type B flexible guide safeties. after initial application, what provides the final force in the safety jaw assembly spring after installing the compensating sheave, you prepare to attach the comp ropes. where will the ropes attach under the car you have installed a high rise traction and notice it slips traction at the top and bottom floors. what must be installed to counteract this comp ropes/chains you need to determine runby clearance. between which points do you measure counterweight and strike plate the elevator you are working on is counterbalanced at 40% and the total car weight is 3000lb. the capacity load is 2500lb. you must load the counterweight frame. what should the total weight of the frame be 4000lbs

while performing maintenance on an elevator, you notice a lack of lubrication on the suspension means, what could be a consequence if this is not addressed loss of cable diameter when inspecting preformed/non preformed ropes for wear, what is an important consideration it is more difficult to detect broken wires on preformed you should compare the governor rope tag to what governor data plate you have set up the car and counteweight for rope replacement and have landed the counterweight on two metal stanchions. at what capacity must these stanchions be rated each stanchion must be capable of supporting the entire load you are reroping and elevator and have selected two chainfalls to hang the car. the total weight of the car is 4000. what should be the minimum capacity of each chain fall 4000 lbs

what are 3 distinct parts of the construction of steel hoist ropes wire, strand, core what are the characteristics of lang lay rope kinks easier, less resistant to cutting what should be considered when blocking the counterweight runby and stretch you are preparing to install the compensating ropes. where should the reels and jacks be set up lowest access point after installing the comp ropes, where should the car be positioned to check rope tension top of the hoistway you are preparing to install comp chains and notice there are two sets of hitch points. which ones should you initially use? two nearest the counterweight