GCSS-Army Maintenance Supervisor's Course Test 1 Rated A, Exams of Military Strategy and Training

1. __________ are used to schedule preventive services and inspections. ✔✔d. Maintenance Plans 2. A single-cycle maintenance plan is used to schedule services using either a ________ or a ________. ✔✔a. Date cycle, counter cycle 3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a maintenance plan for deletion. ✔✔d. IP02 4. What process within GCSS-Army calculates the quantities needed to satisfy projected consumption or to meet immediate requirements? ✔✔b. Material Requirements Planning (MRP)

Typology: Exams

2024/2025

Available from 12/31/2024

tizian-kylan
tizian-kylan 🇺🇸

2.7

(21)

3.8K documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GCSS-Army Maintenance Supervisor's
Course Test 1 Rated A
1. __________ are used to schedule preventive services and inspections. ✔✔d. Maintenance
Plans
2. A single-cycle maintenance plan is used to schedule services using either a ________ or a
________. ✔✔a. Date cycle, counter cycle
3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a
maintenance plan for deletion. ✔✔d. IP02
4. What process within GCSS-Army calculates the quantities needed to satisfy projected
consumption or to meet immediate requirements? ✔✔b. Material Requirements Planning (MRP)
5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC
Report (ZFE)? ✔✔d. That this is a Provisional MRP Area
6. A General Maintenance Task List can be assigned when: ✔✔d. All of the above
pf3
pf4

Partial preview of the text

Download GCSS-Army Maintenance Supervisor's Course Test 1 Rated A and more Exams Military Strategy and Training in PDF only on Docsity!

GCSS-Army Maintenance Supervisor's

Course Test 1 Rated A

  1. __________ are used to schedule preventive services and inspections. ✔✔d. Maintenance Plans
  2. A single-cycle maintenance plan is used to schedule services using either a ________ or a ________. ✔✔a. Date cycle, counter cycle
  3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a maintenance plan for deletion. ✔✔d. IP
  4. What process within GCSS-Army calculates the quantities needed to satisfy projected consumption or to meet immediate requirements? ✔✔b. Material Requirements Planning (MRP)
  5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC Report (ZFE)? ✔✔d. That this is a Provisional MRP Area
  6. A General Maintenance Task List can be assigned when: ✔✔d. All of the above
  1. When granting GCSS-Army users the authority to post goods receipts using the AIT application, what must be established for the AIT User record? ✔✔a. A validity period
  2. Which transaction code can be used to verify a material's on-hand quantity balance? ✔✔c. /n/ISDFPS/DISP_MAT_SIT
  3. Within transaction code MIGO, what Action, Reference Document, and MvT posting selections must be used to post a goods receipt for material that is considered Found on Installation (FOI)? ✔✔c. A01 Goods Receipt, R10 Other, and 501 (Receipt w/o PO)
  4. Which Material Requirements Planning Type indicates that a material is a bench stock item? ✔✔b. PD
  5. When the shop stock material initial (ZII) Purchase Requisition (PR) is saved, it is automatically __________ by GCSS-Army and it must be reviewed before it can be converted to a Purchase Order (PO). ✔✔d. Parked
  1. A ________ is an inventory management term that denotes a physical inward goods movement of materials resulting in an increase in inventory. ✔✔a. Goods Receipt
  2. The aging indicators identify the age of return purchase requisitions for the materials to be turned in to your Supply Support Activity. Which aging indicator light represents a PR that is between 11 and 30 days old? ✔✔b. Yellow light